The top Management of Galaxy Group, during their long international career, in front line of important projects, gained a unique experience in project development and management particularly in large scale mixed use and hospitality sector. The General Manger have been involved in following projects:

TOWERS

GARREL TOWER

Client: PIERUS – Garrel

Location: Dubailand

Year: 2006-2007

Scope: Coordination design & Project development, as client representative.

Position: COTEBA Project Director

Project: Two 60-level towers, 150.000 m2 including a 4 stars hotel, a 3 stars hotel, more than 1,000 hotel rooms together, service apartments, offices, convention centre, shopping mall, business centre, fitness club, etc. More than 1,000 underground parking spaces.

MARINA SKY TOWERS

Client: East & West

Location: Marina Dubai

Year: 2007-2008

Scope: Project Management, design development, ready for construction

Position: COTEBA Project Director

Project: Twin towers, offices and residential on a common podium, on a prime location at the Dubai Marina, 200.000 m2of GFA.

ENOC TOWERS

Client: ENOC

Location: Dubai Business bay

Year: 2008

Scope: Project initiation an design proposal

Position: COTEBA,

Project Director

Project: 4 towers in a common podium in business bay facing the the Burj Khalifa tower. Pre-Concept design to initiate project.

OFFICES

COGEN HELLAS H/Q

Client: COGEN

Location: Athens

Year: 2001

Scope: Office renovation

Position: COGEN Development director

Project: COGEN Development director.

PART DIEU ILOT H

Client: R.A.C.

Location: Lyon Part Dieu

Year: 1988

Scope: Structural design

Position: SERALP, Project Engineer

Project: R+8 grade A Office building over a 2 lanes road.

PONTE NUOVO

Client: Ecully Municipality

Location: Ecully

Year: 1988

Scope: Concept of Structural design Position: SERALP, Project Engineer  

Project: Project Initiation, office building, landmark of Lyon, over the highway Paris- Lyon.

RESIDENTIAL

ILOT ST LOUIS

Client: Location: Lyon, Place St Louis Year: 1988 Scope: Engineering Design, site coordination. Position: SERALP, Project Engineer In charge of Civil engineering and construction coordination.

Project: Medium cost B+G+5 residential building in Lyon.

MERCIERE JACOBINS

Client: Location: Lyon, Merciere road & Jacobins Place Year: 1988 Scope: Engineering Design, site coordination. Position: SERALP, Project Engineer In charge of Civil engineering and construction coordination.

Project: Medium cost B+G+5 residential building in Lyon.


PART DIEU ILOT H

Client: R.A.C. Location: Lyon, Part Dieu Year: 1988 Scope: Structure Engineer Position: SERALP, Project Engineer

Project: Residential G+6, One level underground parking

VOLOS

Client: Ecully Municipality Location: Volos, Greece Year: 2001   Scope: Development, Design, Project & Construction management Position: SERALP, Project Engineer  

Project: PResidential building B+G+5, With F&B at ground Level.

HOSPITALITY & LEISURE

CLUB OCCAJ Hotel: Client: CDC Location: Les Arcs 2000 Year: 1990   Scope:Project Development & Construction Management Position: SMA, Project Director  

Project: G+11, 2 stars Hotel 224 rooms, in Arc 2000 ski resort. Construction in 7 months Renovation of the “Aiguille Rouge” restaurant.

HOUSE OF TOURISM Client: SIVABEL Location: Val Thorens, ski resort Year: 1990   Scope:Engineering Design & Project management Position: SERALP, Project Engineer  

Project: B+G+5 short stay residential building in Val Thorens ski resort.

HOTEL DU GOLF Client: CDC Location: Les Arcs 1800 Year: 1990 Scope:Construction Management Position: SMA, Project Director

Project: Renovation, 246 rooms 4 stars Hotel, in Arc 1800

VOGEL/ALLIET/AIG. GRIVE II Client: SMA Location: Les Arcs 1800 Year: 1989/1990 Scope:Project Development & Project Management Position: SMA, Project Director

Project: Several buildings G+4 to G+6 residential, 600 short stay apartments.

SEQUOIA LODGE Client: EURODISNEY Location: Paris Area Year: 1992 Scope:: Construction Management Position: COTEBA Site Manager

Project: 4 stars hotel, 1011 rooms themed with events and leisure facilities, important landscape.

CONRAD CAIRO 5* HOTEL AND SERVICED APARTMENTS Client: AIB Location: Cairo Year: 1995 Scope:: Client Representative Position: HILTON Corp. Project Director

Project: 5 stars, 700 rooms luxurious hotel, with Casino, Convention center, restaurants etc. 32 level tower, extension of the World Trade Center of Cairo. Renovation of 120 serviced luxury apartments, 32 levels tower.

ASTIR PALACE Client: Location: Athens Year: 1995 Scope:: Due Diligence Position: HILTON Corp. Project Director

Project: Due diligence and renovation report for this exceptional 3-hotel complex and bungalows overlooking the sea.

ILLULISAT RESORT Client: 3MY Location: Dubai Year: 20098 Scope:: Project Initiation Position: COTEBA, Project Director

Project: Concept and CAPEX evaluation of a resort in World island project in Dubai (Illulisat Island).

NEW TOWNS & MIXED USE DEVELOPMENTS

AMWAJ

Client: SAMA DUBAI

Location: RABAT, MOROCCO

Year: 2006/2008

Scope:: Project Management Position: COTEBA, Project Director

Project: A new Town, mixed-use development with leisure facilities between Rabat & Sales (Bouregreg Valley) Morocco of equivalent 30.000 inhabitants, GFA 1.6 million m2 plus parking, 3 billion USD project.

Tripoli Marina Project

Client: LIBYAN EMIRATES HOLDING

Location: TRIPOLI, LIBYA

Year: 2006/2008

Scope:: Project Management

Position: COTEBA, Project Director

Project: A new Town of 600.000 m2 Mixed-use development in Tripoli’s best location in 2 km of waterfront. Concept design by F+P

SAMHA Gardens Project

Client: E&W

Location: Samha, Abu Dhabi

Year: 2006/2008

Scope:: Project Management

Position: COTEBA, Project Director

Project: A new Town of innovative concept “Sand-alone” of 500.000 m2 Mixed-use development.

HALF MOON BEACH

Client: ABIAT

Location: Dammam, KSA

Year: 2009/2012

Scope:: Project Management

Position: COTEBA, Project Director

Project:Development of a new Town of 350.000 inhabitants in 30 years mixed-use development, with holistic approach, Cost evaluation, market research, SWOP analysis, positioning and branding of the town.

CULTURE & EDUCATION

OPERA OF LYON

Client: ABIAT

Location: Lyon

Year: 1988

Scope:: Structural design, verification during rehabilitation phasing.

Position: SERALP, Project Engineer, Project Director

Project:Complete rehabilitation of Lyon’s opera.

MULTI-ACTIVITIES TEMPORARY SPACE

Client: SMA

Location: Les Arcs 1800

Year: 1990

Scope:: Project Management

Position: SMA, Project Director

Project:Installation of a temporary inflatable multi-activities structure.

INTERNATIONAL ACADEMY

Two private schools of high standards, 20.000 m each, in Reem island. Design development coordination. (2013-2014). Design by Stride and Treglown.

ARABIC ACADEMY

Two private schools of high standards, 20.000 m each, in Reem island. Design development coordination. (2013-2014). Design by Stride and Treglown.

INDUSTRIAL & COMMERCIAL

SANOFI

Client: Sanofi

Location: Jeddah

Year: 2010

Scope:: Concept design coordination, constructability & cost evaluation Position: COTEBA, Project Director

Project: Pharmaceutical pills plant, 7.000 m2 at King Abdulla industrial Zone, Jeddah.

BIANCHINI FERRIER

Client: Bianchini Ferrier

Location: Lyon

Year: 1988

Scope:: Structural design and site technical coordination. Position: SERALP, Project Engineer

Project: Silk activities, luxury products

CARREFOUR HYPERMARKET

Client: CARREFOUR

Location: Givors France

Year: 1997

Scope:: Project Management Position: Project Director

Project: Renovation of the mall gallery, of the Hypermarket and implementation of the new parking concept and packaging.

HEALTHCARE

VIP HOSPITAL IN AL AIN

Client: Confidential

Location: Al Ain

Year: 2015 (on going)

Main Consultant: STH (on going)

Scope: Design Coordination

Position: Project Manager

Project: VIP Hospital in Al Ain 110 beds, VIP services.

INFRASTRUCTURES

CONCRETE PAVING HIGWAYS AND BRIDGES

Client: RCA

Scope::Inspection Engineer, due diligence,

1979 Inspection and database creation of all French concrete Paving Highways

1980 Inspection of hundred bridges in France, to establish an Operation & Maintenance database.

HANGAR –SALT STORAGE

Client: SAPRR

Location: Gannat

Year: 1987

Scope:: Concept of structures Position: SERALP, Project Engineer

Project: Wood structure for salt storage

VIADUC DE LA BEAURE

Client: SCETAUROUTE

Location: Valence-Grenoble highway

Year: 1988

Scope:: Preliminary design Position: SERALP, Project Engineer

Project: Viaduc 60-80-80-80-60m spans, pre-stressed concrete


RETAINING WALL

Client: DDE Grenoble

Location: RN 75

Year: 1987

Scope: Structural design

Position: SERALP, Project Engineer

Project: Retaining wall with passive anchorage

NOISE REDUCTION WALL

Client: SAPRR

Location: Villefranche

Year: 1987

Scope:: Structural design Position: SERALP, Project Engineer

Project: Concrete precast wall, some elements with Plexiglas

NOISE REDUCTION WALL

Client: Ecully Municipality

Location: Ecully, Lyon Highway

Year: 1988

Scope: Concept structural design Position: SERALP, Project Engineer

Project:Special precast wall with sound absorption


INTER-HOTEL ROAD

Client: Euro Disney

Location: Euro Disney

Scope: Construction Management

Project:Internal road on Euro Disney site between hotels

RADAR TOWER

Client: Thales

Location: New Dubai Central Airport

Year: 2010

Scope:: Construction Management

Position: COTEBA, Project Director

Project:Concrete tower for radar installation.